3.3 Cleaning
A. Clean finished fume hood, work surfaces, and accessories. Touch up as required, wipe down and
vacuum the interior of the equipment. Note: Polypropylene will carry a static charge and, as such,
attract dirt and dust. Consult MSDS for precautions.
B. Remove all protective masking for cabinet surfaces.
3.4 Protection of Finished Work
A. Provide all necessary protective measures to prevent exposure of the fume hood to other construction
activity during installation.
B. Advise contractor of procedures and precautions for protection of material, installed fume hood and
fixtures from damage by work of other trades.
-- END OF SECTION --.