
DOOR & HARDWARE PREPARATION
1)
REMOVE PAPER TEMPLATES FROM CENTER OF THIS BOOK.
CL
2)
TAPE DRILLING TEMPLATE ON DOOR AND FRAME USING VERTICAL AND REF. OF DEVICE (REFER TO ).
CENTERPUNCH AND DRILL HOLES FOR DEVICE AND STRIKE MOUNTING AFTER DRILLING HOLES, REMOVE DRILLING
TEMPLATE.
2
LC
TRIM SIDE OF DOOR DEVICE SIDE OF DOOR
3) USING OUTSIDE TRIM, PREPARE DOOR USING SEPARATE TRIM DIRECTION SHEET. FOR SEXBOLT INSTALLATIONS,
DRILL 3/8" DIAMETER HOLES ON TRIM SIDE OF DOOR ONLY. (SEE DIAGRAM BELOW)
.
LHR SHOWN
3
1/8" GAP
DOOR FRAME
1/8" GAP
(3/4" MAX)
FINISHED FLOOR
BOTTOM LATCH
DRILLING TEMPLATE
(F)19-V DEVICE HEAD
DRILLING TEMPLATE
TOP LATCH
DRILLING TEMPLATE
DEVICE
SIDE OF
DOOR
TRIM
SIDE OF
DOOR
DEVICE C
L
VERT C
L
TOP LATCH
DRILLING TEMPLATE
DEVICE HEAD
DRILLING TEMPLATE
BOTTOM LATCH
DRILLING TEMPLATE
LHR SHOWN
REVERSING INSTRUCTIONS
TO CHANGE THE HANDING OF A 19-V DEVICE
1) REMOVE CHASSIS COVER (2 SCREWS, COVER IS NOT SHOWN)
.
2) REMOVE HOUSING
A (2 SCREWS).
3) REMOVE SLIDEBAR LEVER
B AND DRAWBAR LEVER C.
4) ROTATE RETRACTOR CAM
D TO CORRECT POSITION, SEE FIGURE 1 (RHR) OR FIGURE 2 (LHR).
NOTE: FOR INSTALLATIONS WITH NO TRIM, RETRACTOR CAM D SHOULD POINT TOWARDS BOTTOM OF DOOR.
5) INVERT DRAWBAR LEVER
C AND INSTALL ON OPPOSITE PIVOT PIN E. SEE FIGURES BELOW.
6) INSTALL SLIDE BAR LEVER
B MAKING SURE TEETH ARE ENGAGED WITH DRAWBAR LEVER C AND THAT NUB ON B
FITS WITHIN SLOT IN
F.
7) REASSEMBLE HOUSING
A (2 SCREWS).
8) PROCEED WITH DEVICE INSTALLATION
.
NOTE
:RETRACTOR CAM D AND DRAWBAR LEVER C SHOULD POINT IN THE SAME DIRECTION AND TOWARDS THE TOP
OF THE DOOR WHEN DEVICE IS INSTALLED WITH TRIM.
NOTE
:A RHR DEVICE REQUIRES RHR TRIM, SEE TRIM INSTALLATION SHEET FOR TRIM REVERSING PROCEDURES.
5
RHL :2 ERUGIFRHR :1 ERUGIF
DRAWBAR
LEVER C
PIVOT PIN
FOR LHR E
SLIDEBAR
LEVER BRETRACTOR CAM
(BLACK PLASTIC) D
SLOTS OFFSET TO
EDGE OF CHASSIS AS
SHOWN
SLIDEBAR
BLEVER
DRAWBAR
CLEVER
PIVOT PIN
EFOR RHR
SLIDEBAR F
CHASSIS
HOUSINGA