Loading...
Preventive and Corrective Maintenance
10/100 Internal ZebraNet PrintServer, Wireless Print Server, Parallel Port, No Comm
300
13291L-001 Rev. A S4M Maintenance Manual 10/27/05
4. See Figure 163. Remove the six screws and one nut securing the main logic board to the
frame of the printer.
5. Remove the two studs and washers securing the serial port connector to the back of the
printer.
Figure 163 • Remove the Main Logic Board
6. Remove the main logic board from the printer.
7. Is there a 10/100 internal ZebraNet PrintServer, wireless print server, or parallel port kit
already installed on the printer?
1Main logic board nut (1)
2Main logic board mounting screws (6)
3Main logic board
4Serial port mounting studs (2)
5Parallel port mounting screws (2)
If… Then…
No Go to Install the Parallel Port Board, 10/100 Internal ZebraNet PrintServer,
No Communication, or the Wireless Print Server on page 303.
Yes Proceed to step 8.
2
3
1
4
5
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com