Loading...
4211-82-G 08-01-14 7014132 314 SKSM 104 K
INSTALLATION AND OPERATING INSTRUCTIONS Page 4
DIAGRAM 3 DIAGRAM 4
OFF ON
1
2
3
4
5
6
7
8
9
ONE HOUR OPERATING ZONE FOR 9 HOUR DELAY TIMER
This area from "OFF" to "ON" is the operating zone. This is
the only time the heater is on.
DELAY ZONE
This area from "9" to "ON" is the delay zone, meaning the
heater can be programmed to come on up to nine hours
later. The heater will not operate in this area.
Sensor protective cover. Locate bottom
of sensor 5" from ceiling directly above
center of heater. (See diagram 5.)
Room light outlet box 70
inches up from oor. Do not
locate directly over heater.
(2) #14 wires and Ground AWG
90°C wire to control.
Screw control box to 2x4 blocking
stud.
Note: if sensor wire is exposed on
surface of the sauna wall cover with
wooden molding.
Temperature control box. Face out from sauna
room ve feet up from oor.
Control circuit wire.
2x4 blocking for bracket
mounting.
Flex conduit. Provide three feet
into room during rough-in.
Power input
to heater.
Control circuit
wire.
Optional separate light circuit if control
light is used.
DIAGRAM 5
DIAGRAM 5, continued
Back of
sensor 5" from
ceiling to
bottom of
sensor
Insert screwdriver tip here to unsnap
sensor cover from sensor.
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com