Loading...
24
8. Replace the graphics board if one was removed
9. Re-attach any SCSI cables which were removed
10. Attach the I/O bulkhead to the cutout at the rear of the system,
with the screws provided. Be careful to route the cable in a
way that will not interfere with other system components or
the system cover.
Attaching the I/O bulkhead and internal SCSI Cable
Figure 9: DS-KZCCA-BB I/O bulkhead Installed
11. Replace the system cover, and all external cables.
Retaining
Screw
68 Pin HVD
SCSI Connector
Loading...
Terms of Use | Privacy Policy | DMCA Policy
2006-2020 Rsmanuals.com